Case Study No. 5 – Mahanagdong A & B Geothermal Power Stations (2000-2014)

Project Info
  • Category: Overhaul Supervision & Project Management
  • AllGen : Supervising inspecting turbine steam cylinder components at Mahanagdong PS
Project Details

Mahanagdong A & B Geothermal Power Stations (2000-2014)

2014 AllGen staff provided technical supervision of the overhauls to Unit 2 Toshiba 60 MW geothermal turbines.

2013 AllGen staff provided technical supervision of the overhauls to Unit 1 Toshiba 60 MW geothermal turbines.

2006 AllGen staff provided technical supervision of the overhauls to 3 Toshiba 60 MW geothermal turbines.

2005 AllGen staff provided technical supervision of the overhauls to 2 Toshiba 60 MW geothermal turbines.

2003 AllGen staff provided technical supervision of the overhauls to 3 Toshiba 60 MW geothermal turbines.

2002 AllGen staff provided technical supervision of the overhauls to 3 Toshiba 60 MW geothermal turbines.

2001 AllGen staff provided technical supervision of an emergency turbine rotor change on a Toshiba 60 MW geothermal turbine.