Malitbog Geothermal Power Station (2000-2006)

2015 AllGen provided technical supervision support for the overhaul of the MBCP bottoming plant steam turbine overhaul 16MW GE Turbine.

2006, AllGen provided technical supervision for the overhaul of the turbine units 1 and 2 which are Fuji 80 MW units. The work also included steam cylinder levelling and alignment and the strip, clean and reassembly of the Fuji generators on Units 2 and 3 (80 MW).

2005, AllGen staff provided technical supervision for the overhaul of 3 Fuji 80 MW geothermal turbines. The overhaul included full strip down, clean and refurbishment of the geothermal turbines and steam cylinder levelling and alignment.

2003, AllGen staff provided technical supervision for the overhaul of 3 Fuji 80 MW geothermal turbines. The overhaul included full strip down, clean and refurbishment of the geothermal turbines and strip, clean and reassembly of the generators

2002, AllGen staff provided technical supervision for the overhaul of 3 Fuji 80 MW geothermal turbines. The overhaul included full strip down, clean and refurbishment of the geothermal turbines and strip, clean and reassembly of the generators.

2000, AllGen staff provided technical supervision for the overhaul of 2 Fuji 80 MW geothermal turbines. The overhaul included full strip down, clean and refurbishment of the geothermal turbines.